China Double Stage Worm Gearbox for Converyor double stage worm gearbox

Merchandise Description

RV collection Attributes

  • RV – Dimensions:–150
  • Input Possibilities: with enter shaft, With Square flange,With Enter Flange
  • Input Electrical power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-forged aluminium alloy budy and over 110 in forged iron
  • Ratios in between 5 and 100
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium units are equipped complete with synthetic oil and permit for common mounting positions, with no need to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are available with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, minimal/higher temperature oil, filling/drain/breather/amount plug,Tiny hole

Fundamental versions can be used to a broad selection of electrical power reduction ratios from 5 to 1000.
Guarantee: One year from day of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Pace Variety:
Variety Previous Variety Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

Starshine Generate

ZheJiang CZPT Generate Co.,Ltdthe predecessor was established in 1965. CZPT specializes in the complete energy transmission remedy for high-conclude tools producing industries based on the purpose of “Platform Product, Application Layout and Specialist Support”.
Starshine have a robust specialized pressure with over 350 personnel at current, such as in excess of thirty engineering professionals, 30 good quality inspectors, covering an area of 80000 square CZPT and varieties of superior processing equipment and tests equipments. We have a excellent foundation for the sector application advancement and support of high-conclude velocity reducers & variators owning to the provincial engineering technological innovation investigation heart,the lab of equipment speed reducers, and the base of modern R&D.

Our Staff

High quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping and delivery

Application: Motor, Machinery, Agricultural Machinery
Function: Distribution Power, Change Drive Torque, Speed Changing, Speed Reduction
Layout: Corner
Hardness: Hardened Tooth Surface
Installation: Horizontal, Vertical
Step: Double-Step
Customization:
Available

|